Sandhills Foul Water Pumping Station
CLIENT: Persimmon Homes
DATE: September 2014 – March 2015
PROJECT: Persimmon Homes housing development at Ingleby Barwick
SCOPE OF WORK: Retroflo’s experienced engineering team were employed to carry out the detailed M&E and civil design of the foul pumping station required at the new development in Ingleby Barwick.
Gaskell Lane Pumping Station
The works consisted of constructing an underground structure to house a packaged pumping station, complete with a sump and all associated pipework, isolation and non-return valves. Installation of the Kiosk onto an existing plinth supplied by others complete with ducts to the new underground structure.
Open the Case StudyDomestic EV Charge Point Installation
CLIENT: Private Client
DATE: January 2014
PROJECT: Supply and Installation of a Domestic Electric Vehicle Charge Point
SCOPE OF WORK:
Survey the domestic property to check electrical compliance. A Retroflo engineer undertook the installation of the Rolec wall-mounted charge point. The 16A 3.6Kw Mode 3 model is one of the most economical charging stations on the market and includes a J1772 (type 1) tethered lead connection gun, holster, pin lock and status LED. Once the engineer was happy that the unit was fully operational, he then undertook handover, instructing the client on using the unit and getting the most from low tariff electricity periods.
Saltburn Bathing Waters
Works consisted of replacing the existing Motor Control Center (MCC), which was beyond its asset date and non-compliant, with a new, fully compliant MCC. Works also included installation of new actuated penstocks and new instrumentation to control the flow from a new 6000m³ storage tank at Guisborough work.
Open the Case Study