Pumping Station
Case Studies

CLIENT: Northumbrian Water Group

DATE: December 2015 – Jan 2016

PROJECT: Flood Alleviation Site Situated in Houghton-Le-Spring

SCOPE OF WORK: Works consisted of installing a Flood Alleviation pumping station in Houghton-Le-Spring. Retroflo were contracted to supply, install and commission the Mechanical and Electrical works of the site. This included the supply of the Motor Control Center (MCC), Instrumentation, interconnecting cable and associated junction boxes, containment items and earthing installation. Kiosks to house the MCC and REC equipment were also installed.

Open the Case Study