The meter station houses the control and monitoring for the existing valves. The scope included replacing the building services and Distribution Board, a new control panel and telemetry outstation within the station building, while maintaining the existing control and telemetry. A new mains generator incomer was installed and the station earthing system upgraded to TT to comply with NWG regulations.
Open the Case Study