MILBURN
PARK SEWERAGE PUMPING STATION
The existing station was a conventional underground
wet well with surface covers, and contained two
submersible pumps. It was proposed that the new
station would be designed for the future long-term
operational requirements and thus would need to
be a three pump station operating in a Duty/Assist/Standby
mode. With the installation of Retroflo RPC_2000
the user was able to easily configure the controller
for the two pump station operation required for
short-term use, and in the future to readily reconfigure
the controller for the three pump station operation
required in the long-term.
Download
Case Study PDF
BATES
COLLIERY
Lorem ipsum dolor sit amet, consectetuer adipiscing
elit. Proin pharetra blandit urna. Maecenas fringilla
fringilla turpis. Cras ultrices. Aenean vehicula
hendrerit nisl. Phasellus dapibus dolor non velit.
Nunc dignissim libero in neque. Nulla lacinia tincidunt
nisl. Suspendisse molestie, justo id commodo vehicula,
augue metus bibendum nisi, mattis ornare est urna
eu tellus. In sodales metus vitae sem. Cras tortor.
Etiam erat. Phasellus dapibus dolor non velit. Nunc
dignissim.
Download Case Study PDF
SOUTH
SHIELDS PILOT
Lorem ipsum dolor sit amet, consectetuer adipiscing
elit. Proin pharetra blandit urna. Maecenas fringilla
fringilla turpis. Cras ultrices. Aenean vehicula
hendrerit nisl. Phasellus dapibus dolor non velit.
Nunc dignissim libero in neque. Nulla lacinia tincidunt
nisl. Suspendisse molestie, justo id commodo vehicula,
augue metus bibendum nisi, mattis ornare est urna
eu tellus. In sodales metus vitae sem. Cras tortor.
Etiam erat. Phasellus dapibus dolor non velit. Nunc
dignissim.
Download Case Study PDF
ILSHAM VALLEY SEWAGE PUMPING STATION
As an example of efficiency improvements, the recent installation of the RPC_2000 at South West Water’s Ilsham Valley Pumping Station has recorded a substantial reduction in absorbed power through reduced blockages, cleaner wells and the optimization of pump performance. In terms of labour costs alone the station saved £20k on the 2008 expenditure for reactive maintenance call-outs to unblock pumps.
Download Case Study PDF
CORONATION
STREET TRANSFER PUMPING STATION
Lorem ipsum dolor sit amet, consectetuer adipiscing
elit. Proin pharetra blandit urna. Maecenas fringilla
fringilla turpis. Cras ultrices. Aenean vehicula
hendrerit nisl. Phasellus dapibus dolor non velit.
Nunc dignissim libero in neque. Nulla lacinia tincidunt
nisl. Suspendisse molestie, justo id commodo vehicula,
augue metus bibendum nisi, mattis ornare est urna
eu tellus. In sodales metus vitae sem. Cras tortor.
Etiam erat. Phasellus dapibus dolor non velit. Nunc
dignissim.
Download Case Study PDF
REDROW
TRANSFER PUMPING STATION
Since Retroflo technology has been used to control
the pumping system at NWL Red Row SPS, the frequency
of blockages has been vastly reduced and Northumbrian
Water M&E Maintenance Dept. reports that the pumping
operations and general site M&E performance have
been excellent. Byzak completed the refurbishment
of The Red Row SPS refurbishment was and the site
re-commissioned in mid/end Feb 2007.
Download Case Study
PDF
SKINNINGROVE
TRANSFER PUMPING STATION
Since implementing the Retroflo system in Skinningrove
Transfer Pumping Station no operator / maintenance
intervention has been required to remove blockages
from the pumps. By initiating pump reversal cycles
on detection of partial blockages and returning the
pump to optimum operating conditions, this equates
to a 12% decrease in power during normal operation.
A vast improvement in the condition of the Wet Well
is observed due to success of the Flushing Cycle.
The Flushing Cycle serves to cleanse the Wet Well
which reduces the threat of blockages to the pumps
and reduces the need for routine cleansing.
Download
Case Study PDF